Shiprock, New Mexico — Major Water Infrastructure Upgrade

Large Diameter Pipe Installation | HDD Pullback Support | Brewis Heavy Duty Swivel In Use

Shiprock, New Mexico saw another major milestone this week as a key section of large-diameter water pipeline was successfully installed using horizontal directional drilling. The operation brings the project significantly closer to completion — supporting critical infrastructure improvements for the region.

A number of specialist contractors, suppliers, and operators were involved in making the pull a success, including S.J. Louis Construction, Northwest Pipe Company, Atlas Trenchless, LLC, RMS Cranes of Albuquerque, and Girardi’s Crane & Rigging Inc. Brewis Engineering is proud that our equipment played a role in keeping the pull progressing safely and efficiently.

Trusted Performance for Demanding Ground Conditions

Large-scale trenchless pipeline installation in remote environments requires equipment that can deliver consistent performance while managing high tensile load and rotational resistance. Brewis heavy-duty HDD swivel technology helped ensure:

  • Secure and controlled load transfer during pullback
  • Smooth rotation to minimise torque buildup
  • Protection of the pipeline from stress-related damage
  • Continuous progress in a challenging drilling environment

Designed for the harsh realities of HDD work, Brewis swivels remain the preferred choice on high-stakes utility installations across North America.

Collaboration That Drives Results

This project is a strong example of what the industry does best — multiple expert teams working seamlessly to deliver essential infrastructure that strengthens community resilience. Every milestone reflects the hard work and coordination across the supply chain.


Project Snapshot

SpecificationDetails
LocationShiprock, New Mexico, USA
Project PurposeRegional water infrastructure upgrade
MethodHorizontal Directional Drilling
Key ContractorS.J. Louis Construction
Supporting PartnersNorthwest Pipe Company, Atlas Trenchless, RMS Cranes, Girardi’s Crane & Rigging
Brewis EquipmentHeavy-duty HDD swivel (model dependent on final site spec)*

* Full equipment specification can be included if you have the model and loading figures for this pull.


Supporting Clean Water Access in the Southwest

By helping improve buried water infrastructure with minimal surface disruption, the project supports:

  • Long-term service reliability
  • Environmental protection
  • Sustainable growth for the Shiprock community

Brewis Engineering is proud to contribute to major utility upgrades across the United States — powering progress where it matters most: underground.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare